You are here

HAFTADA ÜÇ GÜN ÇALIŞAN İŞGÖRENLERİ VE ÇOKLU VARDİYALARI OLAN ORGANİZASYONLARIN ÇİZELGELEME PROBLEMLERİ İÇİN SIFIR BİR PROGRAMLAMA MODELİ

ZERO-ONE PROGRAMMING MODEL FOR SCHEDULING PROBLEMS OF ORGANIZATIONS THAT HAVE LABOURS WORKING THREE DAYS AWEEK AND HAVE MULTIPLE SHIFTS

Journal Name:

Publication Year:

Author NameUniversity of AuthorFaculty of Author
Abstract (2. Language): 
A compressed workweek is a workweek which workers work fewer days a week but a longer duration in a day. In this paper a workforce scheduling problem that includes compressed workweeks has been studied. A zero-one programming model has been set up to solve three days aweek and multiple shifts working scheduling problem which was based on Hung’s (1993) study. This model has been applied on a sample problem and the results of the solution has been evaluated.
Abstract (Original Language): 
Hızlandırılmıs çalısma haftası isgörenlerin haftada daha az sayıda gün ama günde daha uzun süre çalıstıgı çalısma haftasıdır. Bu çalısmada, sıkıstırılmıs çalısma haftalarını içeren isgücü çizelgeleme problemi ele alınmıstır. Hung’un (1993) çalısması esas alınarak isgörenlerin haftada üç gün ve çoklu vardiyalar seklinde çalıstıgı karar problemini çözmek için sıfır bir programlama modeli kurulmustur. Bu model bir örnek problem üzerinde uygulanmıs ve çözüm sonuçları yorumlanmıstır.
187-197

REFERENCES

References: 

ALFARES, Hesham K. (2004); “Survey, Categorization, and Comparison of
Recent Tour Scheduling Literature”, Annals of Operations
Research,127 , ss.145-175.
ALFARES, Hesham.K.; (2000), “Dual-Based Optimization Of Cyclic Three-
Day Workweek Scheduling”, Asia-Pacific Journal of Operations
Research, 17, ss.137-148.
ALFARES, Hesham.K.; (2003), “Flexible 4-day Workweek Scheduling With
Weekend Work Frequency Constraints”, Computer and Industrial
Engineering, 44, , ss.325-338.
BURNS, Richard.N.; Rangarajan NARASIMHAN ve L.Douglas. SMITH;
(1998) “A Set Processing Algorithm For Scheduling Stuff on 4-Day or
3-Day Workweeks”, Naval Research Logistics, 45, ss.839-853.
DANTZIG, George B.;(1954) “ A Comment On Edie’s Traffic Delays At Tool
Booths” Operations Research, 2(3), June 21, ss. 339-341.
HUNG, Rudy; (1993), “A Three-Day Workweek Multiple-Shift Scheduling
Model”, Operational Research Society, 44(2), ss.141-146.
HUNG, Rudy; (1994a), “Multiple-shift Workforce Scheduling Under 3-4
Workweek with Different Weekday and Weekend Labor
Requirements”, Management Science, 40(2), ss.280-284.
HUNG, Rudy; (1994b) “A Multiple-shift Workforce Scheduling Model Under
the 4-Day Workweek with Weekday and Weekend Labor Demands”,
Operational Research Society,.45(9), ss.1088-1092.
NARASIMHAN, Rangarajan; (2000) “An Algorithm For Multiple Shift
Scheduling Of Hierarchical Workforce On Four-Day Or Three-Day
Workweeks”, Infor, 38(1), ss.14-32.
SEÇKNER ULUSAM, Serap; Hadi GÖKÇEN ve Mustafa KURT.; (2007) “An
Integer Programming Model For Hierarchical Workforce Scheduling
Problem”, European Journal of Operational Research, 183, ss. 694-
699.