Journal Name:
- Süleyman Demirel Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi
Publication Year:
- 2001
Keywords (Original Language):
| Author Name | University of Author | Faculty of Author |
|---|---|---|
- 1
- Turkish
REFERENCES
1. Akella, R., Choong, Y., and Gershwin, S.B., 1984, Performance of hierarchical production scheduling policy, IEEE Transactions on Components, Hybrits, and Manufacturing Technology, CHMT-7, 215¬217.
2. Ammons, J.C., Lofgren, C.B., and McGinnis, L.F., 1981, A Large Scale Machine Loading Problem in Flexible Assembly, Annals of Operations Research, Vol.3,319-322.
3. Atmaca, E., ve Erol, S., 2000, Goal Programming Model For Flexible Manufacturing Systems, The 2000 IEEE International Conference on Management of Innovation and Technology, ICMIT 2000, Singapore.
4. Avonts, L.H., and Van Wassenhove, L.N., 1988, The Part mix and routing mix problem in FMS: a coupling between an LP model and closed queueing network, Int.J.Prod.Res., Vol.20, No.12, 1891-1902.
5. Basnet, C., and Mize, J.H., 1994, Scheduling and control of flexible manufacturing systems: a critical review, Computer Integrated Manufacturing, Vol.7, No.6, 340-355.
6. Bastos, J.M., 1988, Batching and routing: Two functions in the operational planning of flexible manufacturing systems, European J.of Op.Res., 33, 230-244.
7. Browne, J., Dubois, D., Rathmill, K., Sethi, S.P., and Stecke, K.E., 1984, Classification of Flexible Manufacturing Systems, the FMS Magazine, 2, 114-117.
8. Bruno, G., Elia, A., and Laface, P., 1986, A rule-based system to schedule production, IEEE Computer, 19, 32-40.
9. Bu-Hulaiga, M.I., and Chakravarty, A.K., 1988, An object-oriented knowledge representation for hierarchical ral-time control of flexible manufacturing, Int.J.Prod.Res., 26, 821-844.
10. Buzacott, J.A., and Yao, D.D., 1982, Flexible manufacturing systems: a review of analytical models, Management Science, 32, 890-905.
11. Carrie, A.S., Adhami, E., Stephens, A., and Murdoch, I.C., 1984, Introducing a flexible manufacturing system, Int.J.Prod.Res., 22, 907-916.
80
12. Chakravarty,A.K., and Shtub, A., 1984, Selecting parts and loading flexiblemanufacturing systems, Proceedings of the First ORSA/TIMS Special Conference on Flexible Manufacturing Systems, Ann Arbor, Michigan, 284-289.
13. Chandra, J., and Talavage, J., 1991, Intelligent dispatching for flexible manufacturing, Int.J.Prod.Res., 29, 2259-2278.
14. Chang, Y.,Sullivan, R.S., and Wilson, J.R., 1986, Using SLAM to design to materials handling system of a flexible manufacturing system, IntJ.Prod.Res., 24, 15-26.
15. Chang, Y., and Sullivan, R.S., 1990, Schedule generation in a dynamicjob shop, Int.J.Prod.Res., 28, 65-74.
16. Chang, Y., Matsuo, H., and Sullivan, R.S., 1989, A bottleneck-based beam search forjob scheduling in FMS's, Int.J.Prod.Res., 27, 1949-1961.
17. Chen, Y., and Askin, R.G., 1990, A Multiobjective evaluation of flexible manufacturing system loading heuristics, Int.J.Prod.Res., Vol.28, No.5, 895-911.
18. Chen, I.J., and Chung, C.H., 1991, Effects of loading and routing decisions on performance of flexible manufacturing systems, Int.J.Prod.Res., Vol.29, No.11, 2209-2225.
19. Choi, R.H., and Malstrom, E.M., 1988, Evaluation of traditional work scheduling rules ina flexible manufacturin system with a physical simulator, Journal of Manufacturing System, 7, 33-45.
20. Chryssolouris, G., Wright, K., Pierce, J., and Cobb, W., 1988, Manufacturing systems operation: dispatch rules versus intelligent control, Robotics and Computer-Integrated Manufacturing, 4, 531-544.
21. Chung, C.H., 1986, Loading flexible manufacturing systems:a heuristic approach,Computers and Industrial Engineering, 11(1-4), 246-250.
22. Co, H.C., Jaw, T.J., and Chen, S.K., 1988, Sequencing in FMS's and other short queue-length systems, Journal of Manufacturing Systems, 7, 1-7.
23. Co, H.C., Biermann,J.S., and Chen, S.K., 1990, A Methodical approach to the flexible manufacturing system batching, loading, and tool configuration problems, Int.J.Prod.Res., 28, 2171-2186.
24. Crite, G.D., Mills, R.I., and Talavage, J.J., 1985, PATHSIM, A Modular simulator for an automatic tool handling system evaluation in FMS, Journal ofManufacturing Systems, 4, 15-27.
8
25. Das, S.C.; Nagendra, P.; 1997, Selection of routes in a flexible manufacturing facility, Int.J.Prod.Economics, 48, 237-247
26. Davis, W.J., and Jones, A.T., 1989, On-line concurrent simulation in production scheduling, Proceedings of the Third ORSA/TIMS Conference on Flexible Manufacturing Systems, 253-258.
27. D'Angelo, A., Massimo, G., and Levialdi, N., 1996, Multicriteria evaluation model for flexible system design, Computer Integrated Manufacturing Systems, Vol.9, No.3, 171-178.
28. Dean, B., and Schniederjans,Y.M., 1990, A goal programming approach to production planning for flexible manufacturing systems, Journal of Engineering Technology Management, 6, 207-220.
29. Denzler, D.R., and Boe, W.j., 1987, Experimental investigation of flexible manufacturing system scheduling decision rules, Int.J.Prod.Res., 25, 979¬994.
30. Han, M.H., and McGinnis, L.F., 1989, Flow control in flexible manufacturing minimization of stockout cost, Int.J.Prod.Res., 27, 701-715.
31. Huang, Y.P., and Chen, C.S., 1986, Flexible Manufacturing Systems:An Overview and Bibliography, Production and Inventory Management, Third Quarter.
32. Hutchison, J., Leong, K., Snyder, D., and Ward, F., 1989, Scheduling for randomjob shop flexible manufacturing systems, Proceedings of the Third ORSA/TIMS Conference on Flexible Manufacturing Systems, 161-166.
33. Hwan , S.S., and Shogan, A.W., 1989, Modelling and solving an FMS part selection problem, Int.J.Prod.Res., Vol.27, No.8, 1349-1366.
34. Ishii, N., and Talavage, J.J., 1991, A Transient-based real-Time Scheduling algorithm in FMS, Int.J.Prod.Res., 29, 2501-2520.
35. Iwata , K., Murotsu, A., Oba, F., and Yasuda, K., 1982, Production Scheduling of flexible manufacturing systems, Annals of CIRP, 31, 319¬322.
36. Jaikumar, R., and Van Wassenhove, L.N., 1989, A Production Planning framework for flexible manufacturing systems, Journal of Manufacturing Operations Management, 2, 52-79.
37. Jain, S., Barber, K., and Osterfeld, D., 1989, Expert simulation for on-line scheduling, Proceedings of the 1989 Winter Simulation Conference, 930¬935.
82
38. Kim, Yeong-Dae; Yano, Candace, Arai; 1993, Heuristics approaches for loading problems in flexible manufacturing systems, IIE Transactions, Vol.25,Iss.1, 26-39.
39. Kimemia, J., and Gershwin, S.B., 1983, An algorithm for the computer control of production in flexible manufacturing systems, IIE Transactions, 15, 353-362.
40. Kimemia , J.G., and Gershwin, S.B., 1985, Flow optimization in FMS's, IntJ.Prod.Res., 23, 81-96.
41. Kumar, P., Tewari, N.K., and Singh, N., 1990, Joint Consideration of Grouping and Loading Problems in Flexible Manufacturing System, Int.J. Prod.Res., 25,1053-1068
42. Kusiak, A., 1986, Modelling and Design of FMS's, Elsevier Science Publishers b.v., Amsterdam.
43. Kusiak, A., 1989, KBSS: A Knowledge and optimization based system for manufacturing scheduling, Int.Industrial Engineering Conference and Societies Manufacturing Productivity Symposium Proceedings, 694-699.
44. Lashkari, R.S., Dutta, S.P.,and Padhye, M.A., 1987, A new formulation of operation allocation problem in flexible manufacturing systems:mathematical modelling and computational experience, IntJ.Prod.Res., 25, 1267-1283.
45. Lee, S.M., Jung, H.J., 1989, A multi-objective production planning model in a flexible manufacturing environment, Int.J.Prod.Res., vol.27., No.11, 1981-1992.
46. Liang, M.; and Dutta, S.P., 1993, An integrated approach to the part selection and machine loading problem in a class of flexible manufacturing systems, European J.of Op.Res., Vol.67, Iss.3, 387-404.
47. Liang, M., 1994, Integrated machining speed, part selection, and machine loading decisions in flexible manufacturing systems, Computers and Industrial Engineering, 26(3), 599-608.
48. Maimon, O.Z., and Gershwin, S.B., 1988, Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines, Operations Research, 36(2), 279-292.
49. Mohamed, Z.A.,1995, Ramifications of tool magazine size on the makaspan and routing flexibility of flexible manufacturing systems, European J.of Op.Res, 87, 289-298.
83
50. Mohamed, Z.A.,1996, A flexible approach to (re) configure flexible manufacturing cells, European J.ofOp.Res., 566-576.
51. Mohamed, Z.M., Bernardo, J.J., 1997, Tool planning models for flexible manufacturing systems, European J.ofOp.Res., 103, 497-514.
52. Mohamed, Z.A.; Kumar A.; and Motwani, J., 1999, An improved part groupingmodel for minimizing makespan in FMS, European J.of Op.Res, Vol.116, Iss.1, 171-182.
53. Moreno, A.,and Ding, F., 1993, Heuristics for the FMS-Loading and part type selection problems, Int.J.Flexible Manufacturing Systems, 287-300.
54. Mukhopadhyay, S.K., Maiti, B., and Garg, S., 1991, Heuristic solution to the scheduling problems in FMS's, Int.J.Prod.Res., 29, 2003- 2024.
55. Myint, S.; and Tabucanon, M.T., 1994, A Multiple- criteria approach to machine selection for flexible manufacturing systems, Int.J.Prod.Economics, Vol.33, Iss.1-3, 121-131.
56. Nof, S.Y., Barash, M.M., and Solberg, J.J., 1979, Operational control of item flow in versatile manufacturing systems, Int.J.Prod.Res., 17, 479-489.
57. O'Grady, P.J., and Menon, U., 1987, Loading a flexible manufacturing system, Int.J.Prod.Res., vol.25, No.7, 1053-1068.
58. Park, S.C., Raman, N., and Shaw, M.J., 1989, Heuristic learning for pattern directed scheduling in a FMS, Proceeding of the Third ORSA/TIMS Conference on Flexible Manufacturing Systems, 369-376.
59. Piplani, R., and Talavage, J., 1995, Launching and dipatching strategies for multi criteria control of closed manufacturing systems with flexible routeing capability, Int.J.Prod.Res., vol.33, No.8, 2181-2196.
60. Ram, B., Sarin, S.C., and Chen, C.S., 1990, A model and a solution approach for the machine loading and tool allocation problem in a flexible manufacturing systems(FMS's), Int.J.Prod.Res., 28, 637-645.
61. Ro, I., and Kim, J., 1990, Multi-criteria operational control rules in flexible manufacturing systems(FMS's), Int.J.Prod.Res., vol.28, No.1, 47-63.
62. Sabuncuoglu, I., and Hommertzheim, D.L., 1992, Experimental investigation of FMS machine and AGV scheduling rules against the mean flıw-time criterion, Int.J.Prod.Res., 30, 1617-1635.
84
63. Sarin, S.C., and Chen, C.S., 1987, The machine loading and tool allocation problem in a flexible manufacturing system, Int.J.Prod.Res., 25, 1081¬1094.
64. Sauve, B., and Collinot, A., 1987, An expert system for scheduling in FMS's, Robotics and Computer-Integrated Manufacturing, 3, 229-233.
65. Schall, S.O., and Chandra, J., 1994, Evaluation of alternative tool combinations in a flexible manufacturing system, Computers and Industrial Engineering, 26(4), 633-645.
66. Shanker, K., and Srinivasulu, A., 1989, Some methodologies for loading problems in flexible manufacturing systems, Int.J.Prod.Res., 27, 1019¬1034.
67. Shanker,K., and Tzen, Y.J., 1985, A loading and dispatching problem in a random flexible manufacturing system, Int.J.Prod.Res., 23(2), 579-595.
68. Shaw, M.J., 1988, Knowledge-based scheduling in FMS's: an integration of pattern-directed interference and heuristic search, Int.J.Prod.Res., 26, 821-844
69. Singh, N., 1996, Flexible manufacturing systems, Systems Approach To Computer Integrated Design and Manufacturing, 529-576. Stecke, K.E., 1985, Design, Planningand Control Problems of FMS's, Annals of Operations Research, 3, 3-12.
70. Slomp, J.Gaalman, G.J.C., and Nawrjm, W.M., 1988, Quasi on-line scheduling procedures for FMS, Int.J.Prod.Res., 26, 585-598.
71. Stecke, K.E., 1983, Formulations and solutions of nonlinear integer production planning problems for flexible manufacturing systems, Management Science, 29(3), 273.
72. Stecke, K.E., and Solberg, J.J., 1981, Loading and Control Policies For a Flexible Manufacturing Systems, Int.J. Prod.Res., 19,481-490.
73. Suri, R., 1985, An overview of evaluative models for flexible manufacturing systems, Annals of Operations Research 3, 13-21.
74.
Tübitak
, Esnek Üretim/Esnek Otomasyon Sistem ve Teknolojileri, 1994.
75. Ventura, J.A., Chen, F.F., 1988, Loading tools and machines in flexible manufacturing systemes, Computers and Industrial Engineering, vol.15, no. 1-4, 223-230.
85
76. Wilhelm, W.E., and Shin, H.M., 1985, Effectiveness of alternate operations in a flexible manufacturing system, Int.J.Prod.Res., 23, 65-79.
77. Wilson, J.M., 1992, Approaches to machine load balancing in flexible manufacturing systems, J.of the Operational Research Society, Vol.43, Iss.5, 415-427.
78. Wu, S.D., and Wysk, R.A., 1989, An application of discrete -event simulation to on-line control and scheduling in flexible manufacturing, IntJ.Prod.Res., 27, 1603-1623.
79. Yao, D.D., and Buzacott, J.A.,1985, Modelling the performance of flexible manufacturings systems, Int.J.Prod.Res., 23, 949-959.