[I] İçli, S., Çolak, M. ve Çubukçu, M., "TURKEY: PV Technology Status and Prospects-Pieces Falling into Place", IEA-PVPS Annual Report 2011, pp. 102-105, 2012.
[2] Çubukçu, M., Çolak, M. "National Survey Report of PV Power Applications in Turkey", IEA-PVPS Task 1 Report, 2011.
[3] Benz, J., Ortiz, B., Roth., W., and et al., "Fuel Cells in Photovoltaic Hybrid Systems for Stand-Alone Power Supplies", 2nd European PV-Hybrid and Mini-Grid Conference, Kassel, Germany, 232-239, 2003.
[4] Chaurey, A., Kandpal, T. C., "Assessment and evaluation of PV based decentralized rural electrification: an overview", Renewable and Sustainable Energy Reviews, 14, 2266-2278, 2010.
[5] Ibrahim, M., "Decentralized Hybrid Renewable Energy Systems Control Optimization and Battery Ageing Estimation Based on Fuzzy Logic", Ph.D. dissertation, University of Kassel, Germany, 2002.
[6] Kleinkauf, W., Sachau, J., "Components for Modular Expandable and Adaptable PV systems, 12th EUPVSEC, Amsterdam, the Netherlands, pp. 1711-1713, 1994.
[7] DGS (The German Energy Society), "Planning & Installing Photovoltaic Systems", Book, 384 p, 2009.
[8] TS EN 61724, "Photovoltaic system performance monitoring - Guidelines for measurement, data exchange and analysis", 26 p, 1999.
[9] Wittkopf, S., Valliappan, S., Liu, L., Ang, K.S., Cheng, S.C.J.,
"Analytical performance monitoring of a 142.5 kWp grid-connected rooftop BIPV system in Singapore", Renewable Energy 47, 9-20, 2012. [10] Kymakis, E., Kalykakis, S., Papazoglou, T.M., "Performance analysis of a grid-connected photovoltaic park on the island of Crete", Energy Conversion and Management 50,
433-438, 2009.
[II] Rehman, S., El-Amin, I., "Performance evaluation of an off-grid photovoltaic system in Saudi Arabia", Energy 46 (2012) 451-458, 2012.
[12] Diaz, P., Pena, R., Munoz, J., Arias, C.A., Sandoval, D., "Field analysis of solar PV-based collective systems for rural electrification", Energy 36, 2509-2516, 2011.
[13] Sharma, R., Tiwari, G.N., "Technical performance evaluation of stand-alone photovoltaic array for outdoor field conditions of New Delhi", Applied Energy, 92, 644¬652, 2012.
[14] Aristizabal, A.J., and Gordillo, "Performance monitoring results of the first grid-connected BIPV system in Colombia", Renewable Energy 33: 2475-2484, 2008.
[15] IEA-PVPS T2-06, "Cost and Performance Trends in Grid-Connected Photovoltaic Systems and Case Studies", 54p,
2007.
[16] Metwally, A.E., "Modelling and Simulation of a Photovoltaic Fuel Cell Hybrid System", PhD Thesis, Faculty of Electrical Engineering, University of Kassel, Germany, 166p, 2005.
[17] Protogeropoulos, C., Klonaris, I., Petrocheilos, C., Charitos, I., and Martinac, I., "Performance evaluation of different PV module technologies in a grid-connected pilot project in Greece", 25nd European Photovoltaic Solar Energy Conference, Valencia, Spain, 6-10 September 2010.
[18]
Çubukçu
, M., 2011, "Türkiye'nin Farklı Konumlarında Farklı Topolojilerde Fotovoltaik-Rüzgâr-Yakıt Pili Hibrid Güç Sistemlerinin Modellenmesi, Karşılaştırmalı Simülasyonu ve Uygulamalı Performans Analizi", Ege
207
M. Çubukçu, M. Çolak
Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, Cilt 19, Sayı 5,2013, Sayfalar 201-208
Üniversitesi Güneş Enerjisi Enstitüsü, Doktora Tezi, İzmir,
2011.
[19] Jallouli, R., Krichen, L., "Sizing, techno-economic and generation management analysis of a stand alone photovoltaic power unit including storage devices",
Energy, 40, 196-209, 2012. [20] TSE CLC/TS 61836, "Fotovoltaik güneş elektriği enerji
sistemleri - Terimler, tarifler ve semboller", 77 s, 2010.
[21] PVGIS (European Commission - Joint Research Center, Photovoltaic Geographical Information System), http://re.jrc.ec.europa.eu/pvgis, (Erişim tarihi: 18 Temmuz 2011).
[22] MGM (Meteoroloji İşleri Genel Müdürlüğü), yazılı görüşme, 2010.
Thank you for copying data from http://www.arastirmax.com