Buradasınız

ANALİTİK AĞ SÜRECİ İLE PERSONEL SEÇİMİ

PERSONNEL SELECTION USING ANALYTIC NETWORK PROCESS

Journal Name:

Publication Year:

Abstract (2. Language): 
In literature, there are various methods regarding personnel selection. However, it is observed thatin these methods, the interdependency of per sonnel selection factors are not taken into consideration. In this paper, a method including interdependencies of the personnel selection factors is studied for the purpose of satisfying the defect noticed. Firstly, the factors eligible to be accepted as criteria in personnel selection are determined, and a decision-making model demonstrating the dependency between these factors is developed. Global weights of the factors in the model are estimated by means of Analytic Network Process (ANP). Secondly, an evaluation scale as to the assessment of personnel selection factors is formed. Lastly, the way the adequacies of applicants can be measured is depicted with an example
Abstract (Original Language): 
Literatürde personel seçimi problemi için kullanılan farklı metotlar bulunmaktadırAncak, bu yöntemlerde personel seçim faktörlerinin karşılıklı bağımlılığı dikkate alınmamaktadır. Bu çalışmada yöntemlerin bu eksiliğinin giderilmesi amacıyla faktörler arasındaki bağımlılıkları da dikkate alan bir yöntem çalışması yapılmıştır. İlk olarak, personel seçimi probleminde kullanılacak faktörler belirlenmiş ve bu faktörler arasındaki bağımlılıklar belirlenerek birkarar vermemodeligeliştirilmiştir. Bu modelde yer alan faktörlerin global ağırlıkları Analitik Ağ Süreciyle belirlenmiş ve bu ağırlıklar kullanılarak faktörler temelinde geliştirilen skalalar ilebir personel seçimi algoritması önerilmiştir. Çalışmada son olarak örnek bir çalışma üzerindeadaylarınyeterlilik düzeylerinin nasıl belirleneceği gösterilmiştir.
99-118

REFERENCES

References: 

Arvey,R. D.,and Campion,J. E., (1982), “The Employment Interview:A Summary
and Review of Recent Research”, Personel Psychology, 35, 281-322.
Bayazıt,O.,(2002), “A New Methodology in Multiple Criteria Decision-Making
Systems: Analytical Network Process (ANP) and an Application”, Ankara
University,Journal of Faculty of Political Sciences, 57, 15-34.
Bohanec, M., Urh,B.,and Rajkovic,V.,(1992), “Evaluating Options by Combined
Qualitative and Quantitative Methods”, Acta Psychologica, 80, 67-89.
Capaldo,G.,and Zollo,G.,(2001), “Applying Fuzzy Logic to Personnel
Assessment: A Case Study ”, The International Journal of Management Science, 29,
585-597.
Cheng, E. W. L.,and Li,H.,(2001), “Analytic Hierarchy Process an Approach to
Determine Measures for Business Performance”, Measuring Business Excellence, 5,
30-36.
Chung,S.H., Lee,A. H. L., and Pearn,W. L.,(2006), “Analytic Network Process
(ANP) Approach for Product MixPlanning in Semiconductor Fabricator”,
International Journal of Production Economics, 96,15-36.
Metin DAĞDEVİREN, İhsan YÜKSEL
116
Gardiner,A. R.,and Armstrong-Wright,D.,(2000), “Employee Selection and Anti-Discrimination Law: Implications forMulti-Criteria Group Decision Support”,
Journal of Multi-Criteria Decision Analysis, 9, 99-109.
Gargano, M. L., Marose, R. A., and Kleeck,L.,(1991), “An Application of
Artificial Neural Networks and Genetic Algorithms to Personnel Selection in The
Financial Industry”, Proceedings of the First International Conference on Artificial
Intelligence Applications,257-262.
Hooper,R.S., Galvin,T.P., Kimler,R. A.,and Liebowitz,J.,(1998), “Use of an
Expert System in a Personnel Selection Process”, Expert Systems with Applications,
14, 425-432.
Jessop,A.,(2004), “Minimally Biased Weight Determination in Personnel
Selection”, European Journal of Operational Research, 153, 433-444.
Karsak,E. E.,(2001), “Personnel Selection Using a Fuzzy MCDM Approach Based
on Ideal and Anti-Ideal Solutions”, Multiple Criteria Decision Making in The New
Millenium, Berlin.
Karsak,E. E., Sozer,S.,and Alptekin,S. E.,(2002), “Production Planning in
Quality Function Deployment Using a Combined Analytical Network Process and
Goal Programming Approach”, Computers&Industrial Engineering, 44, 171-190.
Kaynak,T., (2002), Human Resources Management,Nobel Yayınevi, İstanbul.
Lee,J.W., and Kim,S. H.,(2001/a), “An Integrated Approach for Independent
Information System Project Selection”, International Journal of Project
Management, 19, 111-118.
Lee,J.W.,andKim,S. H.,(2001/b), “Using Analytic Network Process and Goal
Programming for Interdependent Information System Project Selection”,
Computers&Operations Research, 27, 367-382.
Liang,S.L., and Wang,M. J.,(1994), “Personnel Selection Using Fuzzy MCDM
Algorithm”, European Journal of Operational Research, 78, 22-33.
Meade,L.M., and Sarkis,J.,(1998), “Strategic Analysis of Logistics and Supply
Chain Management Systems Using The Analytical Network Process”,
Transportation Research Part E: Logistics and Transportation Review, 34, 201-215.
Meade, L. M., and Sarkis,J.,(1999), “Analyzing Organizational Project Alternatives
for Agile Manufacturing Processes: An Analytical Network Apprpach”,
International Journal of Production Research, 37, 241-261.
İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi Bahar2007/1
117
Meade,L. M.,and Presley,A.,(2002), “R&D Project Selection Using the Analytic
Network Process”, IEEE Transactions on Engineering Management, 49, 59-66.
Mikhailov, L., and Singh,M. S.,(2003), “Fuzzy Analytic Network Process and Its
Application to The Development of Decision Support Systems”, IEEE Transactions
on Systems, Man, and Cybernetics-Part C: Applications and Reviews,33, 33-41.
Miller,G. M., and Feinzig,S. L., (1993), “Fuzzy Sets and Personnel Selection:
Discussion and an Application”, Journal of Occupational and Organizational
Psychology, 66, 163-169.
Momoh,J. A., and Zhu,J. Z.,(1998), “Application of AHP/ANP to Unit
Commitment in The Deregulated Power Industry”, IEEE International Conference
on Systems, Man and Cybernetics, 1, 817-822.
Momoh,J.A., and Zhu,J.,(2003), “Optimal Generation-Scheduling Based on
AHP/ANP”, IEEE Transactions on Systems, Man, and Cybernetics-Part B:
Cybernetics, 33, 531-535.
Niemira,M. P., and Saaty,T. L.,(2004), “An Analytical Network Process Model for
Financial-Crisis Forecasting”, International Journal of Forecasting, 20, 573-587.
Partovi, F. Y., and Corredoira,R. A.,(2002), “Quality Function Deployment for The
Good of Soccer”, European Journal of Operational Research, 137, 642-656.
Roth,P. L.,and Bobko,P.,(1997), “A Research Agenda forMulti-Attribute Utility
Analysis in Human Resource Management”, Human Resource Management
Review, 74, 441-472.
Saaty, T. L.,(1980), The Analytic Hierarchy Process, McGraw-Hill, New York.
Saaty,T. L.,(1996), Decision Making with Dependence and Feedback: The
Analytic Network Process, RWSPublications, Pittsburgh.
Sarkis,J.,(2002/a), “Quantitative Models for Performance Measurement Systems-Alternate Considerations”, International Journal of Production Economics, 86, 81-90.
Sarkis,J.,(2002/b), “A Model for Strategic Supplier Selection”, Journal of Supply
Chain Management, 38, 18-28.
Spyridakos, A., Siskos, Y., Yannacopoulos,D.,and Skouris,A.,(2001),
“Multicriteria Job Evaluation for Large Organisations”, European Journal of
Operational Research, 130, 375-387.
Metin DAĞDEVİREN, İhsan YÜKSEL
118
Timmermans,D.,andVlek,C., (1992), “Multi-Attribute Decision Support and
Copmlexity: An Evaluation and Process Analysis of Aided Versus Unaided
Decision Making”, Acta Psychologica, 80, 49-65.
Timmermans,D., and Vlek,C.,(1996), “Effects on Decision Quality of Supporting
Multi-Attribute Evaluation in Groups”, Organizational Behavior and Human
Decision Processes, 68, 158-170.
Yurdakul,M.,(2003), “Measuring Long-Term Performance of a Manufacturing
Firm Using The Analytical Network Process (ANP) Approach”, International
Journal of Production Research, 41, 2501-2529.

Thank you for copying data from http://www.arastirmax.com