Determination of Biogas and Electricity Generation Capacity in Tokat Domestic Wastewater Treatment Plant
Journal Name:
- Gaziosmanpaşa Üniversitesi Ziraat Fakültesi Dergisi
Keywords (Original Language):
Author Name | University of Author | Faculty of Author |
---|---|---|
Abstract (2. Language):
In this study, aimed to determine biogas and electricity generation capacity obtained from wastewater treatment plant was evaluated. For this purpose, Tokat Wastewater Treatment Plant, established in Taşlıçiftlik location within the boundaries of the Municipality of Tokat, was considered and its sections and stages until the production of biogas were explained in detail. The Biogas produced in this plant are determined to meet the total heating energy need of the facility. 47% of electric energy need of the facility is obtained from biogas.
Bookmark/Search this post with
Abstract (Original Language):
Bu çalışmada, atıksu arıtma tesisinde atıklarından elde edilen biyogaz ve elektrik üretim kapasitesinin belirlenmesi amaçlanmıştır. Bu amaçla Tokat Belediyesi sınırları içindeki Taşlıçiftlik Mevkii’nde bulunan Tokat Atıksu Arıtma Tesisinde var olan bölümler, biyogaz ve elektrik üretimi yapılıncaya kadar geçen aşamalar ayrıntılı açıklanmıştır. Bu tesiste üretilen biyogaz, tesisin ısı enerjisi ihtiyacının tamamını karşıladığı belirlenmiştir. Tesisin elektrik enerjisi ihtiyacının %47’lik kısmı biyogazdan elde edilmektedir.
FULL TEXT (PDF):
- 2