[1] Biskup, D., "A state-of-the-art review on scheduling with
learning effects" European Journal of Operational
Research, 188 (2), 315-329, 2008. [2] Biskup, D., "Single-machine scheduling with learning
considerations" European Journal of Operational Researc,.
115, 173-178, 1999. [3] Mosheiov, G., "Scheduling problems with a learning
effect", European Journal of Operational Research, 132,
687-693, 2001.
[4] Moore, J.M., "An n job, one machine sequencing algorithm for minimizing the number of tardy jobs" Management Science, 15, 102-109, 1968.
[5] Mosheiov, G. Sidney, J.B., "Note on scheduling with general learning curves to minimize the number of tardy jobs", Journal of the Operational Research Society, 56, 110¬112, 2005.
[6] Zhao, C.L. Zhang, Q.L. Tang, H.Y., "Machine scheduling
problems with learning effects", Dynamics of Continuous, Discrete and Impulsive Systems, Series A: Mathematical Analysis, 11, 741-750, 2004.
[7] Wu, C.C. Lee, W.C. Chen, T., "Heuristic algorithms for solving the maximum lateness scheduling problem with learning considerations", Computers & Industrial Engineering, 52, 124-132, 2007.
[8]
Eren
, T., "Zamana-bağımlı öğrenme etkili çizelgeleme probleminde maksimum gecikme minimizasyonu: Doğrusal-olmayan programlama modeli", Gazi Üniversitesi Mühendislik-Mimarlık Fakültesi Dergisi, 23 (2), 459-465,
2008.
[9] Eren, T. Güner, E., "Minimizing total tardiness in a scheduling problem with a learning effect", Applied Mathematical Modelling, 31, 1351-1361, 2007.
[10] Eren, T. Güner, E., "A bicriteria scheduling with a learning effect: total completion time and total tardiness" INFOR: Information Systems and Operational Research, 45 (2), 75-81, 2007.
[11] Wu, C.C. Lee, W.C., "Single-machine scheduling problems with a learning effect", Applied Mathematical Modelling, 32, 1191-1197, 2008.
[12]
Eren
, T., "İki ölçütlü zamana-bağımlı öğrenme etkili çizelgeleme problemi", Süleyman Demirel Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi, 14(1), 387-394,
2009.
[13] Yin, Y. Xu, D. Wang, J., "Single-machine scheduling with a general sum-of-actual-processing-times based and job-position-based learning effect", Applied Mathematical Modelling, 34, 3623-3630, 2010.
[14] Lai, P.J. Lee, W.C., "Single-machine scheduling with general sum-of-processing-time-based and position-based learning effects", Omega, 39, 467-471, 2011.
[15] Lu, Y.Y. Wei, C.M. Wang, J.B., "Several single-machine scheduling problems with general learning effects", Applied Mathematical Modelling, in press, 2012.
[16] Wang, J.B., "Single-machine scheduling problems with the effects of learning and deterioration", Omega. 35, 397-402, 2007.
[17] Wang, X.R., "Single machine scheduling with time-dependent deterioration and exponential learning effect", Computers & Industrial Engineering, 58, 58-63, 2010.
[18] Huang, X. Wang, J.B. Wang, L.Y. Gao, W.J. Wang, J.B., "Single-machine scheduling problems with the effects of learning and deterioration", Omega, 35, 397-402, 2007.
[19] Huang, X. Wang, J.B. Wang, L.Y. Gao, W.J. Wang, X.R., "Single machine scheduling with time-dependent deterioration and exponential learning effect", Computers & Industrial Engineering, 58, 58-63,2010.
[20] Wu, Y.B., "A note on Single machine scheduling with time-dependent deterioration and exponential learning effect'', Computers & Industrial Engineering, 61, 902-903, 2011.
[21] Wu, Y.B. Wang, M.Z. Wang, J.B., "Some single-machine scheduling with both learning and deterioration effects", Applied Mathematical Modelling, 35, 3731-3736, 2011.
[22] Yin, Y. Xu, D., "Some single-machine scheduling problems with general effects of learning and deterioration", Computers and Mathematics with Applications, 61, 100-108, 2011.
79
T. Eren
Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, Cilt 19, Sayı 2,2013, Sayfalar 76-80
[23] Wang, J.B. Hsu, C.J. Yang, D.L. 2012. "Single-machine scheduling with effects of exponential learning and general deterioration", Applied Mathematical Modelling. In press.
[24] Wang, J.B. Li, J.X., "Single machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effects", Applied Mathematical Modelling, 35, 1388-1395, 2011.
[25] Yin, Y. Xu D. Huang, X., "Erratum to ''Single machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effects'' [Appl. Math. Modell. 35, 1388-1395", Applied Mathematical Modelling, 35, 5936-5938, 2011.
[26] Lee, W.C., "A note on single-machine scheduling with general learning effect and past-sequence-dependent setup time", Computers and Mathematics with
Applications, 62, 2095-2100, 2011.
[27] Bai, J. Wang, M.Z. Wang, J.B., "Single machine scheduling with a general exponential learning effect", Applied Mathematical Modelling, 36, 829-835, 2012.
[28] Eren, T., "Hazırlık ve taşıma zamanlarının öğrenme etkili olduğu tek makineli çizelgeleme problemi: Geciken iş sayısı minimizasyonu", International Journal of Engineering Research and Development, 6 (6), 34-36,
2011.
[29] Eren, T., "Logaritmik toplam işlem zaman tabanlı öğrenme
etkili tek makineli çizelgeleme: geciken iş sayısı
minimizasyonu", Nevşehir Üniversitesi Fen Bilimleri
Enstitüsü Dergisi, 1, 83-88, 2012. [30] Eren, T., "Zamana-bağımlı öğrenme etkili tek makineli
çizelgeleme problemleri", Sigma Mühendislik ve Fen
Bilimleri Dergisi, basımda, 2012. [31] Koulamas, C. Kyparisis, G.J., "Single-machine and two-
machine flowshop scheduling with general learning
functions", European Journal of Operational Research,
178, 402-407, 2007.
[32
] Wang, J.B., "Single-machine scheduling with general
learning functions", Computers and Mathematics with
Applications,
56, 1941-1947, 2008. [33] GAMS 22.5, Development Corporation, GAMS- the solver
manuals, GAMS user notes, Washington, DC, USA, 2007.
80
Thank you for copying data from http://www.arastirmax.com