Optimal Placement of FACTS Device to Maximize the Loadability of Transmission Lines

Journal Name:

Publication Year:

Abstract (Original Language): 
This paper deals with the optimal location of Facts device in electrical power systems, using proposed sensitivity performance index using Ant colony based UPFC controlled parameters. The proposed method ACO based optimal power flow control for optimal location. The proposed approach is tested on IEEE-14 bus system. The results obtained are quite promising for the power system operation environment.
17-24

REFERENCES

References: 

[1] M. Noroozian and G. Anderson, “Power Flow Control by use of
Controllable Series Components”. IEEE Trans. on Power
Delivery. Vol.8, No.3 July1993, pp. 1420-1429.
[2] R.Rajaraman, F. Alvarado, A.Maniaci, R.Camfield and S.Jalali,
“Determination of Location and Amount of Series Compensation
to Increase Power Transfer Capability”,IEEE Trans. On Power
System, Vol.13, No.2, May 1998, pp. 294-299.
[3] P. Preedavichit and S. C. Srivastava, “Optimal Reactive power Dispatch
Considering FACTS Devices”, Electric Power Systems Research ,
Vol.16, September 1998, pp.251-257.
[4] Wanliang Fang and H. W. Ngan, “A Robust Lord Flow Technique for
use in Power systems with Unified Power Flow Controllers”,
Electric Power System Research, Vol. 53, Issue3, 1 March-2000, pp.
181-186
[5] S. N. Singh and A. K. David, “Congestion management by Optimizing
FACTS Device Allocation”, Proc. Of International
Conference DRPT 2000, City University, London, 4-7 April
2000, pp. 23-28.
[6] Kazemi and B. Badrzadeh, “Modeling and Simulation of SVC and
TCSC Study Their limits on Maximum Loadability Point”,
International Journal of Electrical Power & Energy System,Vol.26, Issue
8, October 2004, pp.619-626.
[7] H. Farahmand, M. Rashidi-Nejad, and Fotuhi-Firoozabad,
“implementation of FACTS Devices for ATC Enhancement using RPF
Technique”, Proc. Of La rge Engineering system Conference on Power
Energy
[8] A.kumar, S. Chanana and S.Parida, “Combined Optimal location of
FACTS Controller Loadability Enhancement in Competitive Electricity
Markets” Proc. Of IEEE PES Summer Meeting, San Francisco,,12-16
June 2005.
[9] D. Menniti, L. Guagliardi, N. Scordiono and N. sorrentino, “Impact of
FACTS Controllers on System Loadability in Presence of Bilateral
Contracts in a Competitive Environment”, Proceedings of 13
th
PSCC
Conference , Belgium, 2005.
[10] A. J. Wood and B. F. Wollenberg, Power Generation, Operation and
Control John Wiley, New York.
[11] Fletcher R., Practical Methods of Optimization, John Willey & Sons,
1986.
[12]. Dorigo M., Optimization, learning, and natural algorithms, Ph.D.
Dissertation (in Italian), Dipartimento di Elettronica, Politecnico di
Milano, Italy, 1992.
[13]. Dorigo M., Di Caro G., The ant colony optimization metaheuristic, in
Corne D., Dorigo M., Glover F., New Ideas in Optimization, McGraw-Hill, p. 11-32, 1997.
[14] Dorigo M., Di Caro G., Gambardella L. M., Ant algorithms for discrete
optimization,Artificial Life, Vol. 5, No. 2, p. 137-172, 1999.
[15] Dorigo M., Maniezzo V., Colorni A., Ant System, optimization by a
colony of cooperating agents, IEEE Trans. System Man. and
Cybernetics, Part B: Cybernetics,Vol. 26, No. 1, p. 29-41, 1996
[16] W. L. Fang and H.W. Ngan, “Optimising Location of Unified Power
Controllers using the Method of Augmented Lagrange Multipliers”.
IEEE proc., Part-C, Vol. 146, No.5, September1999, pp. 428-434.

Thank you for copying data from http://www.arastirmax.com