You are here

KONYA SANAYİİŞLETMELERİNDE TAM ZAMANINDA ÜRETİM SİSTEMİNİN TANINMIŞLIK DÜZEYİ VE UYGULANABİLİRLİĞİ ÜZERİNE BİR ARAŞTIRMA

A STUDY ON RECOGNITION LEVEL AND APPLICABILITY OF JUST-INTIME SYSTEM IN KONYA INDUSTRIAL ZONE

Journal Name:

Publication Year:

Abstract (2. Language): 
Just-in Time system has been proved his success and a well known system now in 21st century, especially by large firms. But it is not easy to say for small or medium sized firms (SME). As all over the world, SME are not as valorous and successful as the larger ones in Turkey. In this study, a web based questionnaire was made to one hundred firms which are listed as the largest firms by Konya Chamber of Industry. Survey results are evaluated and analyzed by SPSS. As a result Just-in Time system is a far target now, but the industry of Konya has been progress in recently.
Abstract (Original Language): 
Tam Zamanında Üretim Sistemi 21. yüzyılda artık, gerekliliği ve faydaları değil, hangi alanlara doğru yaygınlaşacağı tartışılan bir sistemdir. Zaten, günümüzde pek çok büyük firma başarısını, tartışmasız üstünlüğü kabul edilmiş bu sisteme borçludur. Ancak, bahis konusu olan başarı-sistem korelâsyonu büyük firmalar için kolaylıkla söylenebilirken, küçük ve orta ölçekli işletmeler (KOBİ) için bunu söylemek pek mümkün değildir. Tüm dünyada olduğu gibi Türkiye’de de KOBİ’ler bu sisteme geçişte ölçek yönünden kendinden büyük olanlar kadar cesaretli ve başarılı olamamışlardır. Çalışma kapsamında, Konya Sanayi Odasına kayıtlı en büyük ilk 100 firmaya yönelik olarak internette web tabanlı bir anket araştırması gerçekleştirilmiştir. Elde edilen sonuçlar SPSS paket programı vasıtasıyla değerlendirilmiş ve analiz edilmiştir. Araştırma sonucunda varılan kanı, Tam Zamanında Üretim kavramının uygulamasının henüz Konya için uzak bir hedefmiş gibi görünse de, Sanayi’ nin geçmiş yıllara nazaran bu yolda hayli mesafe kat ettiği yönünde olmuştur.
279-293

REFERENCES

References: 

[1] Emre, A., 1995, Tam Zamanında Üretim Sisteminin Ülkemizdeki Uygulamaları ve
Sorunları, MPM, Ankara.
[2] Okur, A. S., 1997, Yalın Üretim “2000’li Yıllara Doğru Türkiye Sanayii İçin Yapılanma
Modeli”, Söz Yayınları, İstanbul.
[3] Acar, Nesime, 1995, Tam Zamanında Üretim, MPM Yayınları, Ankara.
[4] Goddard, W. E., 1989, “Toyota Versus Nissan: Two Approaches to Resource Planning
and Scheduling”, Annual International Conference Proceedings -American Production
and Inventory Control Society 29th., St. Louis, USA, pp 313-317.
[5] Blau, J. R., 1994, “European Carmakers Turn Lean Mean”, Machine-Design, Vol. 66, n
10, pp 4-8.
[6] Gülsün, B.; Özgürler M., 1994, “TZÜ Sisteminin Performansını Etkileyen Faktörler ve
Ekonomik Çalışma Alanlarının Belirlenmesi”, Yıldız Teknik Üniversitesi Dergisi, s. 14-
18.
[7] Dong, W. Y., 1995, “Lean Production and Industrial Engineering Applied in China”,
Computers and Industrial Engineering, Vol 29, N: 1-4, pp 233-237.
[8] Womack, J. P.; Jones, D. T., 1996, “From Lean Production to the Lean Enterprise”, IEEE
Engineering Management Review, V 24, N: 4, pp 38-46.
[9] Gunasekaran, A.; Lyu J., 1997, “Implementation of Just-In-Time in a Small Company: A
case study”, Production-Planning-and-Control, Vol. 8, N: 4, pp 406-412.
[10] Whitson, D., 1997, “Applying Just-In-Time Systems in Health Care”, IIE-Solutions, V
29, N 8, pp 32-37.
[11] Mclachlin, R., 1997, “Management Initiatives and Just-in-Time Manufacturing”, Journal
of Operations Management, V 15, N 4, pp 271-292.
[12] Kochan, A., 1998, “Automotive Industry Looks For Lean Production”, AssemblyAutomation, V 18, N 2, pp 132-137.
[13] Chandra, S.; Kodali, R., 1998, “Justification of Just-In-Time Manufacturing Systems For
Indian Industries”, Integrated-Manufacturing-Systems, Vol 9, N: 5-6, pp 314-323.
[14] Amoako, G. K.; Gargeya, V. B., 1998, “Implementation of Just-In-Time Production
Systems in Manufacturing Firms in Ghana”, Proceedings Annual Meeting of the Decision
Sciences Institute, Atlanta, Vol 3, pp 1085-1087.
[15] Hancock, W. M.; Zayko, M. J., 1998, “Lean Production: Implementation Problems”, IIE
Solutions, V 30, n 6, pp 38-42.
[16] Muffatto, M., 1999, “Evolution of Production Paradigms: The Toyota and Volvo Cases”,
Integrated-Manufacturing-Systems, V 10, N: 1, pp 15-25.
[17] Aladağ, Z., 1999, “Tam Zamanında Üretim Ortamında Tedarikçilere Yönelik Bir Çok
Ölçütlü Karar Analizi”, Yöneylem Araştırması ve Endüstri Mühendisliği XX. Ulusal
Kongresi, Ankara.
[18] Perez, M. P.; Sanchez, A. M., 2000, “Lean Production and Supplier Relations: A Survey
of Practices in the Aragonese Automotive Industry”, Technovation, V 20, No 12, pp 665-
676.
[19] Canel, C.; Rosen, D.; Anderson E. A., 2000, “Just-in-time is Not Just For Manufacturing:
A Service Perspective”, Industrial Management and Data Systems, Vol. 100, No 2, pp 51-
60.
[20] Cua, K. O.; Mckone, K. E; Schroeder, R. G., 2001, Relationships between implementation
of TQM, JIT, and TPM and manufacturing performance, Journal of Operations
Management, Vol. 19, pp 675–694.
[21] Carnes, T. A., Jones, J. P., Biggart, T. B., Barker, K. J., 2002, Just-in-time inventory
systems innovation and the predictability of earnings, International Journal of Forecasting
(in press).
[22] Ahmad, S.; Schroeder, R. G.; Sinha, K. K., 2003, The role of infrastructure practices in
the effectiveness of JIT practices: Implications for plant competitiveness, Journal of
Engineering and Technology Management, Vol 20, pp 161–191.
[23] Akın, H.B., 1998, Küresel Rekabet Ortamında Teknoloji Yönetimi ve Bisküvi, Çikolata
ve Gofret Sanayinde Teknoloji Yönetimine İlişkin Bir Uygulama, Selçuk Üniversitesi
Sosyal Bilimler Enstitüsü, Yayınlanmamış Doktora Tezi, Konya
[24] Güleş, H.K., 1999, Bilgi Çağı Sanayi İşletmelerinde Rekabet Üstünlüğü Sağlamada
Bilişim Teknolojileri, Yayınlanmamış Doçentlik Tezi, Konya
[25] Güleş, H.K.; Çağlıyan, V., 2001, “Küçük ve Orta Ölçekli Sanayi İşletmelerinde Tedarik
Zinciri Yönetiminin Rekabet Gücü Üzerine Etkisi”, Selçuk Üniversitesi Sosyal Bilimler
Meslek Yüksekokulu Dergisi, Cilt 4, Sayı 2, sayfa 53-78

Thank you for copying data from http://www.arastirmax.com